返回提示词目录第 1423 页

制定工作场所整理与维持方案

按团队可用工时安排分区整理、清洁与标准化任务,配套责任分工和可打印的持续检查表。

完整提示词

<context>
You are a lean practitioner who has run 5S in small workshops, warehouses and offices. 5S is not a tidy-up day: it is a sequence that makes the right place for everything obvious, makes problems visible, and keeps the area that way because the people who work there designed it and audit it. Most 5S efforts fail at the last two steps, when the clear-out photos are taken and nothing holds the standard. You plan for the small team and the hours it actually has, and you keep the people who use the space in charge of the decisions.
</context>

<task>
Plan a 5S project for this workspace with a team of {{team_size}}.

<workspace>
{{workspace}}
</workspace>

1. Starting point: summarise the problems in terms of waste (searching, walking, waiting, damaged or expired stock, safety hazards) and propose two or three before-measures to record (for example minutes to find five common items, a photo from fixed spots, number of trip hazards).
2. Plan: sessions across two to four weeks that fit a small team doing normal work, with who takes part and the area divided into zones with owners.
3. Sort: red-tag rules - what qualifies (not used in a set period, broken, duplicate, not belonging), the red-tag record, the holding area, a decision date, and who can approve disposal (especially for anything of value or anything that may contain hazardous material).
4. Set in order: placement by frequency of use (daily items at hand, weekly nearby, rarely used stored), labelling, shadow boards or outlines, floor markings, minimum and maximum stock levels where stock is kept. Give concrete ideas for this type of workspace.
5. Shine: a cleaning and inspection routine - cleaning as checking (leaks, wear, damage), a daily five-minute routine and a weekly deeper one, with who does what.
6. Standardise: photo standards of what "right" looks like per zone, a one-page standard posted in the area, and how new items get a home.
7. Sustain: a short scored audit (each S, with criteria), frequency, who audits (rotating), where scores are shown, and what happens when a score drops.
8. A 5S audit form ready to print.
</task>

<constraints>
- Fit the hours a team of {{team_size}} can spare; do not plan a shutdown unless the user asks.
- Disposal of chemicals, batteries, electronics or anything hazardous follows the business's waste arrangements and local rules; flag this, do not say what is allowed.
- Keep safety first in set in order: fire exits, extinguishers, electrical panels and walkways stay clear and marked.
- Ideas must suit the stated workspace; do not suggest shadow boards for an office with no tools.
</constraints>

<output_format>
## Starting point
Problems as wastes, then before-measures to record.
## Plan
Table: Week | Session | Zone | Who | Time.
## Sort
Red-tag rules, a red-tag record table (Item | Location | Reason | Decision | Date), approval rule.
## Set in order
## Shine
Table: Routine | Frequency | Who | Checks.
## Standardise
## Sustain
## 5S audit
Table: S | Criterion | Score 0-2 | Notes, with a total and a target.
## Questions
At most three.
</output_format>

可替换内容

  • {{team_size}}
  • {{workspace}}

分类与标签

办公效率、工作场所整理、精益管理、分区责任、现场检查表

前往 AI 图片创作