制作团队工时与项目产能规划表

将人员工时、休假与项目需求整理为工作簿,用公式和热力图显示超负荷、空闲及人手缺口。

完整提示词

<context>
You build capacity planners that managers actually keep up to date. Most fail for predictable reasons: capacity is set to contracted hours, so everyone looks free when in reality 20 to 30% of time goes on meetings, admin, support and leave; allocations are typed into a big grid of weeks with no link to project totals, so nobody sees when a project is under- or over-staffed; dates are entered inconsistently so weekly sums break; and the sheet is so detailed that it is abandoned after a month. A sound design separates input tables (people and their capacity, projects and their demand, allocations as a long table of person, project, week and hours) from calculated views (a person by week grid of booked hours against available hours, a project by week grid of planned against needed hours), uses week-commencing dates as the key, and colours overloads and free capacity so problems jump out. Planning in hours or in percentage of a week both work; mixing them does not.

<team>
{{team}}
</team>

<projects>
{{projects}}
</projects>
</context>

<task>
Build the planner in {{app}}.

1. State assumptions: planning unit (hours per week), the planning horizon, how available capacity is calculated (contracted hours minus a non-project allowance minus leave), and any gaps in the input to confirm.
2. Lay out the workbook: a Settings sheet (horizon start, week list, default non-project percentage); a People table (name, role, contracted hours, non-project percentage, start and end dates); a Leave table (person, week, hours off); a Projects table (project, role, start week, end week, hours needed per week); an Allocations table in long format (person, project, week commencing, hours); and two calculated grids: Person by week and Project by week.
3. Give the exact formulas: week-commencing date from any date; available hours per person per week; booked hours per person per week with `SUMIFS` over Allocations; utilisation percentage; remaining capacity; needed versus planned hours per project per week; and totals per role. Use structured references or named ranges, and make formulas fill across weeks and down people without editing.
4. Add checks and visuals: conditional formatting for the person grid (over 100% red, 85 to 100% amber, under 60% highlighted as spare), project gaps where planned is below needed, allocations to a person outside their start and end dates, and allocations in weeks with full leave. Add a summary block showing the most overloaded people and the most understaffed projects for the next four weeks.
5. Explain the weekly routine: update leave, adjust allocations, review the heatmap, and roll the horizon forward.
6. State the limits of a spreadsheet planner (concurrent editing, scale beyond about 50 people, skills matching) and when dedicated tools make sense.
</task>

<constraints>
- Use only the people, hours and projects given; use clearly marked sample rows where the input is incomplete.
- Every number in a formula comes from a named cell or table, not a hard-coded constant.
- Formulas must work in the chosen app; note any function that differs between Excel and Google Sheets.
- Keep person-level data minimal; do not add performance or personal information.
</constraints>

<output_format>
## Assumptions
## Workbook layout
Table: Sheet | Columns | Purpose.
## Formulas
Each with the cell it goes in and a one-line explanation, in code blocks.
## Heatmap and checks
## How to use it weekly
## Limits
</output_format>