返回提示词目录第 1353 页

内部合规体系审查与整改规划

帮你梳理监管义务与控制证据,输出风险分级、整改计划及需专业确认的合规事项。

完整提示词

Main objective:

> Evaluate whether a compliance program actually detects, prevents, escalates and remediates regulatory risk rather than existing only as policies and training records.

Use OECD risk-based and proportionate enforcement principles as best-practice context, not binding law. Always verify the actual statute, regulator and sector regime first.

## 1. INTAKE GATE

- jurisdictions, regulators and territorial triggers
- products, services, activities and business models
- legal entities, licenses, registrations and permits
- relevant laws, regulations, regulator decisions and license conditions
- reporting, filing, recordkeeping and notification obligations
- existing policies, procedures, controls and testing evidence
- prior inspections, findings, incidents and remediation
- third parties, outsourcing and critical vendors
- key deadlines and effective dates
- accountable owners and governance structure

## 2. SPECIALIZED WORKFLOW

- Evaluate whether a compliance program actually detects, prevents, escalates and remediates regulatory risk rather than existing only as policies and training records.
- Build applicability from factual triggers, not industry labels.
- Separate binding requirements, license conditions, regulator guidance, enforcement practice and internal policy.
- Map each requirement to an operational owner and objective evidence.
- Test whether controls work in practice, not whether documents exist.
- Identify obligations with no control, controls with no legal basis, and evidence that cannot prove performance.
- Model regulator-facing consequences, cure windows and recurrence risk.

## 3. OBLIGATION TRACEABILITY

```text
Obligation ID:
Jurisdiction / regulator:
Source:
Provision / condition:
Applicability trigger:
Requirement:
Frequency / deadline:
Business process:
Control:
Control type:
Evidence:
Owner:
Escalation:
Failure consequence:
Testing method:
Last test:
Status:
```

Statuses: VERIFIED COMPLIANT / PARTIALLY COMPLIANT / NON-COMPLIANT / NOT VERIFIED / NOT APPLICABLE / PENDING EFFECTIVE DATE.

## 4. APPLICABILITY & CHANGE CONTROL

For every new or existing rule:
- verify legal status and effective date
- identify territorial, entity, product, threshold and activity triggers
- map exemptions and transitional rules
- identify conflicting or overlapping regulators
- trace operational changes required before the effective date
- distinguish "must", "should", regulator expectation and internal preference
- record assumptions that require counsel or regulator confirmation

## 5. CONTROL & ENFORCEMENT TEST

Actively test:
- compliance by policy only
- stale obligation registers
- licenses with untracked conditions
- filings dependent on manual memory
- controls that cannot generate evidence
- ownerless obligations
- remediation closed without root-cause verification
- third-party risk transferred contractually but not monitored
- inconsistent treatment across business units
- repeat findings
- regulator correspondence not reflected in controls
- enforcement exposure misranked because only maximum penalties were considered

## 6. REQUIRED MATRICES

### Obligation Register
| Obligation | Source | Trigger | Owner | Control | Evidence | Deadline | Status |
|---|---|---|---|---|---|---|---|

### Regulatory Change Matrix
| Change | Effective date | Impacted process | Gap | Required action | Owner | Due date |
|---|---|---|---|---|---|---|

### Control Effectiveness Matrix
| Control | Prevent/Detect | Frequency | Evidence | Test | Failure mode | Residual risk |
|---|---|---|---|---|---|---|

## 7. FINDING FORMAT

```text
ID:
Severity:
Status:
Jurisdiction / regulator:
Obligation:
Source:
Applicability:
Observed state:
Control:
Evidence:
Gap:
Breach / enforcement consequence:
Root cause:
Recurrence risk:
Remediation:
Owner:
Deadline:
Verification:
Residual risk:
```

P0 - unlawful operation, missing critical authorization or immediate enforcement blocker  
P1 - material breach, repeat finding or systemic control failure  
P2 - significant obligation/control/evidence weakness  
P3 - correctable documentation, ownership or testing gap  
P4 - compliance-system hardening

## 8. REQUIRED OUTPUT

1. Executive compliance summary.
2. Regulatory applicability map.
3. Obligation register.
4. P0-P4 findings.
5. Regulatory change and deadline map.
6. Control-effectiveness analysis.
7. Inspection / enforcement readiness.
8. Remediation plan.
9. Evidence-pack requirements.
10. Final law-to-evidence traceability check.

End with **Regulatory Traceability Check** confirming every material obligation is linked to source, trigger, owner, control, evidence, deadline and consequence.

This supports compliance research and preparation. It does not replace qualified legal or regulatory advice.

分类与标签

办公效率、合规审查、监管义务台账、内控测试、整改计划

前往 AI 图片创作