采收季每周用工测算与招聘排期
依据产量与采收效率编制每周岗位人数表,测算高峰和天气影响,并倒排招聘时间。
完整提示词
<context>
You help a grower work out how many people the harvest needs, week by week, before recruiting. Crew plans usually go wrong in four ways: they divide the total crop evenly over the season and miss the peak; they use experienced pick rates for a crew that is half new starters; they count paid hours as picking hours (walking, breaks, weighing and rain stops eat 10-20%); and they size pickers but forget packers, runners, quality checkers and supervisors. A good plan sizes the crew for the peak week, shows the ramp-up and ramp-down, and says what a bad week does to it.
Crop: {{crop}}
Harvest window: {{harvest_window}}
</context>
<task>
<expected_yield>
{{expected_yield}}
</expected_yield>
{{#pick_rate}}
<pick_rate>
{{pick_rate}}
</pick_rate>
{{/pick_rate}}
1. Build the weekly volume. Use the grower's weekly profile if given. If only a total is given, spread it over a typical bell-shaped profile for the crop, show the percentage per week, and label it an assumption to replace with their own records.
2. Set the rates. Use the grower's own pick and pack rates. If none are given, do not invent a figure as fact: ask for them, and meanwhile show the table with the rate as a clearly labelled planning assumption the grower must replace. Use a productive-hours factor (default 0.85 of paid hours) and a new-starter factor (default 60% of the experienced rate in week one, 80% in week two).
3. Calculate pickers per week: weekly volume / (rate x productive hours per day x picking days). Show the formula once and the arithmetic for the peak week.
4. Add the other roles: packers (from pack rate and the share packed on the day), runners or tractor drivers, quality checkers, and supervisors (default one per 15-20 pickers; say to adjust for crop complexity and language mix).
5. Add an absence and turnover buffer (default 10% in a normal season, 15-20% if many workers are new) and round up to whole people.
6. Run sensitivities: a poor picking week (two days lost to rain and rates down 20%), a peak 20% bigger or a week earlier than planned, and what the crew can catch up the following week before fruit goes over.
7. Work back from the start date to recruitment and accommodation deadlines.
</task>
<constraints>
- Use only the figures given; label every assumption and keep it adjustable.
- Show arithmetic so the grower can check it; totals must add up.
- Do not state legal minimum wages, visa rules, working-time limits or accommodation standards as fact; list them as items to check locally.
- If the crop, total yield or harvest window is missing, ask for it and stop.
{{> output/uncertainty}}
</constraints>
<output_format>
## Assumptions
Bullets: rates, hours, factors and buffers used, each marked "given" or "assumption".
## Weekly volume
Table: week | dates | share of crop % | volume.
## Crew by week
Table: week | pickers | packers | runners and drivers | supervisors | total heads. Bold the peak week. Arithmetic for the peak week underneath.
## Sensitivities
Table: scenario | extra people or hours needed | how to cover it (overtime, extra day, agency, delay a block).
## Recruitment timing
Dated bullets working back from the first picking day.
## Questions
What to confirm to tighten the estimate.
</output_format>可替换内容
- {{crop}}
- {{harvest_window}}
- {{expected_yield}}
- {{#pick_rate}}
- {{pick_rate}}
- {{/pick_rate}}
- {{> output/uncertainty}}
分类与标签
办公效率、采收用工、人员配置、高峰排班、招聘排期、天气情景测算