返回提示词目录第 1439 页

撰写项目需求变更沟通邮件

核对新增需求与原定范围,起草包含费用、工期及可选方案的客户邮件和变更确认表。

完整提示词

<context>
Most scope creep is not bad faith: clients do not remember the statement of work, and each request feels small. Freelancers and agencies lose money and goodwill in two ways: saying yes silently and resenting it, or saying no in a way that sounds like a contract lawyer. The professional middle path treats the request as a good idea worth doing properly, points neutrally to what was agreed, and offers clear choices with their cost and timeline, so the client decides. Starting work before the change is agreed in writing is the most common, most expensive mistake.
</context>

<task>
Write an email about this new request.

<original_scope>
{{original_scope}}
</original_scope>

<new_request>
{{new_request}}
</new_request>
{{#rates_or_costs}}
<rates_or_costs>
{{rates_or_costs}}
</rates_or_costs>
{{/rates_or_costs}}

1. Check the scope first. Classify the request as in scope, out of scope, or ambiguous, quoting the part of the original scope that decides it. If it is in scope, say so and write a short, positive confirmation email instead. If ambiguous, say what makes it ambiguous and write the email as a friendly clarification that proposes your reading.
2. For an out-of-scope request, offer two or three options, choosing those that fit:
   - **Add it as a change:** price and timeline impact.
   - **Swap it:** replace an agreed item of similar effort, named specifically.
   - **Defer it:** to a later phase or a follow-on project, with when.
   - **Reduced version:** a smaller piece that fits within the current scope, if one exists.
   Recommend one if the input suggests which is best for the client.
3. Write the email:
   - Open positively about the idea or the client's goal behind it.
   - One or two sentences that state, neutrally, that it falls outside what was agreed, referring to the specific part of the agreement, without quoting the contract at them in full.
   - The options, each in one or two lines with cost and timeline.
   - The next step: which option they would like, and that work on it will start once they confirm in writing (a reply is enough, or a signed change order if the contract requires one).
4. Write a change summary table the client can approve.
</task>

<constraints>
- Use only the costs and timings supplied. If none are supplied, use `[price]` and `[+N days]` and list them under Notes; never invent rates.
- Friendly, confident and brief: under about 200 words. No apologising for having a scope, no passive-aggressive phrasing ("as clearly stated in the contract").
- Do not threaten to stop work or cite legal terms unless the user asks.
- If the request would affect a fixed deadline or other deliverables, say so in the options.
</constraints>

<output_format>
## Scope check
Classification, the deciding part of the original scope, and one line of reasoning.
## Email
Subject line, then the email.
## Change summary
Table: Option · What is included · Cost · Timeline impact · Status (to approve).
## Notes
Bullets: placeholders to fill, and advice on recording the agreement. "None" if nothing.
</output_format>

可替换内容

  • {{original_scope}}
  • {{new_request}}
  • {{#rates_or_costs}}
  • {{rates_or_costs}}
  • {{/rates_or_costs}}
  • [price]
  • [+N days]

分类与标签

办公效率、需求变更、客户沟通、项目范围、商务邮件

前往 AI 图片创作